Alperton Road Intersection Upgrade
Department of Transport & Main Roads

Client

Alperton Road Intersection Upgrade

Location

Department of Transport & Main Roads

Contractual Completion Date

Current Project

Original Contract Value

$7.5M

Mcilwain Civil were engaged by the Department of Transport & Main Roads to upgrade 700m of Mt Cotton Road including the intersection with Alperton Road.
Contract works involves duplication of the existing carriageway between the existing bridges at Priests Gully and Stockyard Creek. Mcilwain Civil have been awarded the contract based on a strong working relationship with the Department of Transport & Main Roads, suppliers and subcontractors which has been developed over several previous successful contracts.

The project is in an environmentally sensitive region with the surrounding areas being Koala and wildlife protected habitat as well as a Fire Ant area. The works also involve construction and management of sediment retention basins to control site runoff adjacent to both creeks and testing/ treatment procedures prior to any discharge. At the eastern end of the project construction of a Koala crossing bridge structure will allocate a safe passage for Koala’s to cross Mt Cotton Road including monitoring facilities.   Environmental management will provide additional challenges to the project team for the duration of the contract.

The contract also includes signalisation of the intersection of Alperton Road as well as improvements to the lighting and visibility through the site. Close liaison with the residents within the worksite will be necessary to maintain driveway access throughout the project.

Upon completion the  project will vastly improve the safety of this busy intersection for motorists, cyclists as well as local residents and the greater community. 

PROJECT SYNOPSIS

  • 43,000m3 of Clearing & Grubbing
  • 21,500m3 of Excavation
  • 360m of Reinforced Drainage Pipe and RCBC Structures
  • 1200m of Kerb & Channel
  • 1900m of Subsoil Drainage
  • 11,700 tonne of Asphalt Pavements
  • 1,100m  of Electrical & Traffic Signal Conduits & Cabling
  • 17 New Light Poles
  • Koala Crossing Structure including 900mm diameter Piles, Piers & single span steel truss girder unit
  • 1200m of Water Main Relocation

    View images from the project below - click on a thumbnail for a larger version

     Photos coming soon

    Use the link below to download a detailed version of this project summary in PDF format.

     P11-23 Alperton Road Intersection Upgrade